Global Rail Construction Limited Recent Projects
|
Customer |
Project Name |
Project Details |
Date(s) |
|
Interserve Rail Limited |
Horsham Area Resignalling Project |
Provision of IRSE Licensed senior installation
engineers to support the signalling installation works at Horsham. |
Oct 01 - Ongoing |
|
McNicholas Rail Limited |
WARM Phase 2 Commissioning |
Provision of installation teams who were
supervised by our internal resources to support the recovery works during the
WARM phase 2 commissioning. All works within our remit competed five hours in
advance of programme milestones. |
November 2001 |
|
Interserve Rail Limited |
|
Provision of IRSE Licensed senior installation
engineers and points fitters to support the signalling installation works at |
Nov 01 - Ongoing |
|
McNicholas Rail Limited |
Telecomms cable route surveys in
Kent/Sussex areas |
Provision of site survey engineers and local
protection staff to undertake the cable route surveys on behalf of our
client. We also provided the project management resources to enable
co-ordination of the works together with the transfer of information onto the
required format. All documentation was checked and approved by our engineer
prior to hand over to Network Rail. |
December 01 - ongoing |
|
Alstom Signalling
Limited |
|
Provision of IRSE Licensed senior installation
engineers to implement site modifications to the pre-commissioned signalling
system. |
January 02 - ongoing |
|
Irish Rail Limited |
DART ( |
Installation of retaining walls, hard standing, route
refurbishment and cable renewals for a 15 mile radius between Pierce Street
Station and Shank Hill Station. |
Dec 01 May 02 |
|
McNicholas Rail Limited |
WARM Phase 3 areas A &
B |
Provision of SMTH test engineers to undertake
earth readings of track side equipment prior to hand over to Westinghouse
Rail Systems Limited |
January 2002 |
|
Fitzpatrick Rail Limited |
LUL Connect Enabling
Works |
Sub-Contractor to Fitzpatrick Rail for the provision
and installation of concrete bases, access gates and associated minor civil
works on London Underground Limited. |
February 2002 - ongoing |
|
McNicholas Rail Limited |
Ladbroke Grove
Re-instatement Project |
Sub-Contractor to McNicholas
Rail for the provision and installation of all signalling equipment to
complete the re-instatement works at Ladbroke Grove. |
October 02 - April 03 |
|
AMEY Rail Limited |
Installation and Test of
CDS Track Watch System |
Cutting in and testing under SMTH conditions of
the asset condition monitoring system on the GWZ on behalf of AMEY Rail
Maintenance. |
March May 2002 |
|
Finchpalm Limited |
HACM |
Sub-Contractor to Finchpalm
Limited for the provision, installation and 3D cable testing of all
signalling equipment to complete the resignalling
of the HACM Project. |
April 02 April 03 |
|
Finchpalm Limited |
HACM - |
Provision of S&T installation resources to support
the trackside installation works on the HACM project phase 1. |
February 2002 |
|
Westinghouse Rail Systems
Limited |
West Coast Mainline Project |
Provision of qualified staff working under SMTH
conditions to support WRSL works on the project. |
May 02 - ongoing |
|
Westinghouse Rail Systems
Limited |
West Coast Mainline Project |
Provision of qualified points fitting teams and
signalling installation engineers to support WRSL points and signalling
installation works on the project. |
May 02 ongoing |
|
Westinghouse Rail Systems
Limited |
Evergreen/WCML and CTRL
projects |
Provision of IRSE licensed points fitting teams to
support the mechanical and points fitting requirements on the various
projects. |
May 02 July 02 |
|
AMEY Rail Limited |
GWZ Plain line Renewals
Project |
Provision of project management, survey teams,
method statements and testing teams under SMTH conditions to support the
plain line renewals work on the Great Western Zone project. |
May 02 Jan 03 |
|
AMEY Rail Limited |
Channel Tunnel Resignalling Project Contract 550 |
Provision of Site management, survey teams, and civils and signalling
installation teams to complete the installation works for the Ashford project
works. |
June 02 Aug 03 |
|
AMEY Rail Limited |
Channel Tunnel
Re-signalling Project Contract 550 |
Sub-Contractor to AMEY Rail for the Provision of
Management and IRSE licensed Installers to implement and build IRO 80+
location cases for the Channel Tunnel Re-signalling Project. |
September 02 - ongoing |
|
McNicholas Rail Limited |
WARM Phase 4 Stages 1
& 2 |
Sub-Contractor to McNicholas
Rail responsible for the installation of 78 location case bases, hardstandings, handrails and associated troughing works for the Hertford area. |
October 02 February 03 |
|
McNicholas Rail Limited |
WARM Phase 4 Stages 1
& 2 |
Provision of self contained civil gangs required
to remove and refit concrete troughing and
associated cabling on behalf of McNicholas Rail
Limited. |
September 02 - ongoing |
|
SEEBOARD Contractors
Limited |
Holborn |
Sub-Contractor to Seeboard
for the provision of management and self contained team of engineers to
recover 3.2Km of DC 50pr power cable between Holborn and Liverpool Street
(LUL) stations and remove to registered tip.
|
November 02 December 02 |
|
McNicholas Rail Limited |
WARM Phase 4 Stages 1
& 2 |
Sub-Contractor to McNicholas
Rail responsible for the installation, testing and documentation handover for
the earthing of IRO 85 location cases/REBs on the project. |
December 02 - ongoing |
|
Fitzpatrick Rail Limited |
LUL Connect Enabling
Works |
Sub-Contractor to Fitzpatrick Rail for the
demolition and re-build of the first level concrete base for the disused platform
at Tower Hill |
October December 02 |
|
AMEY Rail (Maintenance)
Limited |
Reading S&C Works |
Sub-Contractor to AMEY Rail for the provision of IRSE Licensed Points installation and SMTH Testing teams
to undertake final gauging and |
Nov 02 - April 03 |
|
McNicholas Rail Limited |
Fixed Telecomm Network Project
Kent/Sussex |
Sub-Contractor to McNicholas
Rail responsible for the installation of all associated |
Apr 03 ongoing |
|
McNicholas Rail Limited |
Bletchley Concentrator Upgrade
Project |
Sub-Contractor to McNicholas
Rail Responsible for the termination, jointing and cable integrity testing of
all associated 50pr telecoms cables throughout the project. This also
included the installation and testing of all cabinet earthing
between Ledburn and Bletchley. |
Apr 03 - ongoing |
|
Network Rail |
GWZ Maintenance Support |
Awarded the Sub-Contract on behalf of Network Rail
for the provision of IRSE Licensed Points
installation and SMTH Testing teams to undertake final gauging, |
Apr 03 - ongoing |
|
McNicholas Rail Limited |
Fixed Telecomm Network
Project |
Sub-Contractor to McNicholas
Rail providing Safety Critical resources to support their route survey and
enabling works for the project. Provision of COSS and Lookout/Site Warden
qualified personnel. |
|