Interserve Rail Limited

Horsham Area Resignalling Project

Provision of IRSE Licensed senior installation engineers to support the signalling installation works at Horsham.

Oct 01 - Ongoing

McNicholas Rail Limited

WARM Phase 2 Commissioning

Provision of installation teams who were supervised by our internal resources to support the recovery works during the WARM phase 2 commissioning. All works within our remit competed five hours in advance of programme milestones.

November 2001

Interserve Rail Limited

 

Bournemouth Area Resignalling

Provision of IRSE Licensed senior installation engineers and points fitters to support the signalling installation works at Bournemouth.

Nov 01 - Ongoing

McNicholas Rail Limited

Telecomms cable route surveys in Kent/Sussex areas

Provision of site survey engineers and local protection staff to undertake the cable route surveys on behalf of our client. We also provided the project management resources to enable co-ordination of the works together with the transfer of information onto the required format. All documentation was checked and approved by our engineer prior to hand over to Network Rail.

December 01 - ongoing

Alstom Signalling Limited

Sunderland Resignalling Project

Provision of IRSE Licensed senior installation engineers to implement site modifications to the pre-commissioned signalling system.

January 02 - ongoing

Irish Rail Limited

 

DART (Dublin)

Installation of retaining walls, hard standing, route refurbishment and cable renewals for a 15 mile radius between Pierce Street Station and Shank Hill Station.

Dec 01 – May 02

McNicholas Rail Limited

WARM Phase 3 areas A & B

Provision of SMTH test engineers to undertake earth readings of track side equipment prior to hand over to Westinghouse Rail Systems Limited

January 2002

Fitzpatrick Rail Limited

LUL – Connect Enabling Works

Sub-Contractor to Fitzpatrick Rail for the provision and installation of concrete bases, access gates and associated minor civil works on London Underground Limited.

February 2002 - ongoing

McNicholas Rail Limited

Ladbroke Grove Re-instatement Project

Sub-Contractor to McNicholas Rail for the provision and installation of all signalling equipment to complete the re-instatement works at Ladbroke Grove.

October 02 - April 03

AMEY Rail Limited

Installation and Test of CDS Track Watch System

Cutting in and testing under SMTH conditions of the asset condition monitoring system on the GWZ on behalf of AMEY Rail – Maintenance.

March – May 2002

Finchpalm Limited

HACM – Dublin Phases 2 and 3

Sub-Contractor to Finchpalm Limited for the provision, installation and 3D cable testing of all signalling equipment to complete the resignalling of the HACM Project.

April 02 – April 03

Finchpalm Limited

HACM - Dublin

Provision of S&T installation resources to support the trackside installation works on the HACM project phase 1.

 

February 2002

Westinghouse Rail Systems Limited

West Coast Mainline Project

Provision of qualified staff working under SMTH conditions to support WRSL works on the project.

May 02 - ongoing

Westinghouse Rail Systems Limited

West Coast Mainline Project

Provision of qualified points fitting teams and signalling installation engineers to support WRSL points and signalling installation works on the project.

May 02 – ongoing

Westinghouse Rail Systems Limited

Evergreen/WCML and CTRL projects

Provision of IRSE licensed points fitting teams to support the mechanical and points fitting requirements on the various projects.

May 02 – July 02

AMEY Rail Limited

GWZ – Plain line Renewals Project

Provision of project management, survey teams, method statements and testing teams under SMTH conditions to support the plain line renewals work on the Great Western Zone project.

May 02 – Jan 03

AMEY Rail Limited

Channel Tunnel Resignalling Project – Contract 550

Provision of Site management, survey teams, and civils and signalling installation teams to complete the installation works for the Ashford project works.

June 02 – Aug 03

AMEY Rail Limited

Channel Tunnel Re-signalling Project – Contract 550

Sub-Contractor to AMEY Rail for the Provision of Management and IRSE licensed Installers to implement and build IRO 80+ location cases for the Channel Tunnel Re-signalling Project.

September 02 - ongoing

McNicholas Rail Limited

WARM Phase 4 – Stages 1 & 2

Sub-Contractor to McNicholas Rail responsible for the installation of 78 location case bases, hardstandings, handrails and associated troughing works for the Hertford area.

October 02 – February 03

McNicholas Rail Limited

WARM Phase 4 – Stages 1 & 2

Provision of self contained civil gangs required to remove and refit concrete troughing and associated cabling on behalf of McNicholas Rail Limited.

September 02 - ongoing

SEEBOARD Contractors Limited

Holborn – Liverpool Street Cable Recovery

Sub-Contractor to Seeboard for the provision of management and self contained team of engineers to recover 3.2Km of DC 50pr power cable between Holborn and Liverpool Street (LUL) stations and remove to registered tip. 

November 02– December 02

McNicholas Rail Limited

WARM Phase 4 – Stages 1 & 2

Sub-Contractor to McNicholas Rail responsible for the installation, testing and documentation handover for the earthing of IRO 85 location cases/REB’s on the project.

December 02 - ongoing

Fitzpatrick Rail Limited

LUL – Connect Enabling Works

Sub-Contractor to Fitzpatrick Rail for the demolition and re-build of the first level concrete base for the disused platform at Tower Hill – Mark Lane. Our responsibility was to provide project management, material delivery, completion of works and formal handover to our client. All works completed within programme timescales and within budget.

October – December 02

AMEY Rail (Maintenance) Limited

Reading S&C Works

Sub-Contractor to AMEY Rail for the provision of IRSE Licensed Points installation and SMTH Testing teams to undertake final gauging and FPL testing on completion of rail grinding/replacement works as part of their ongoing maintenance programme between Paddington, Reading and Didcott. Also responsible for the installation and upgrade of several points machines on the project.

 

Nov 02 - April 03

McNicholas Rail Limited

Fixed Telecomm Network Project – Kent/Sussex

Sub-Contractor to McNicholas Rail responsible for the installation of all associated FTN works for various packages between Ashford and Folkstone.

Apr 03 – ongoing

 

McNicholas Rail Limited

 

Bletchley Concentrator Upgrade Project

Sub-Contractor to McNicholas Rail Responsible for the termination, jointing and cable integrity testing of all associated 50pr telecoms cables throughout the project. This also included the installation and testing of all cabinet earthing between Ledburn and Bletchley.

 

Apr 03 - ongoing

Network Rail

GWZ – Maintenance Support

Awarded the Sub-Contract on behalf of Network Rail for the provision of IRSE Licensed Points installation and SMTH Testing teams to undertake final gauging, FPL testing on completion of rail grinding/replacement works and general maintenance duties between Paddington, Reading and Oxford as part of their ongoing maintenance programme requirements. Also responsible for the installation and upgrade of several points machines on the project.

 

Apr 03 - ongoing

McNicholas Rail Limited

Fixed Telecomm Network Project – Leeds Area

Sub-Contractor to McNicholas Rail providing Safety Critical resources to support their route survey and enabling works for the project. Provision of COSS and Lookout/Site Warden qualified personnel.